Webcast library - DPEA Webcasts

Library listings 

December 2021

PPA-270-2238 - Hearing Session on the Impacts on Wild Land Area 39

Thursday, 16th December 2021 at 10:00am
WIND FARM COMPRISING ERECTION OF 7 TURBINES AND ASSOCIATED INFRASTRUCTURE KNOWN AS DRUM HOLLISTAN 2 AT LAND 2215 METRES SOUTH WEST OF UNDER KEEPERS COTTAGE, SANDSIDE, REAY, KW14 8AJ

WIN-130-5 - Sheirdrim Renewable Energy Development - Inquiry session 1 Continued

Wednesday, 1st December 2021 at 9:30am
Hearing Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw

November 2021

WIN-130-5 - Sheirdrim Renewable Energy Development - Hearing sessions 1 & 2

Tuesday, 30th November 2021 at 9:30am
Hearing Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw

PPA-260-2132 - Site Between Sawmillfield Street/Farnell Street, Glasgow - Hearing Sessions

Tuesday, 16th November 2021 at 10:00am
Hearing Sessions on Policy Matters, Design Matters and Planning Obligations and Conditions for Proposed Erection Of Mixed-Use Development Comprising Residential Flats (182 Units) (Sui Generis), One Commercial Unit (Classes 1, 2 Or 3), One Rehearsal Space (Class 10) With Associated Landscaping And Infrastructure

WIN-170-2005 - Shepherds Rig Wind Farm - Hearing Session 3

Friday, 12th November 2021 at 9:30am
Hearing Session on The terms of the draft conditions and any areas of disagreement between the parties on these for proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works

WIN-170-2005 - Shepherds Rig Wind Farm - Hearing Sessions 1 & 2

Thursday, 11th November 2021 at 9:30am
Hearing Sessions on Planning and energy policy and Traffic and transport for proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works

PPA-400-2121 - Hearing

Monday, 1st November 2021 at 10:00am
HEARING FOR THE ERECTION OF 104 HOUSES,
FORMATION OF ACCESS ROADS, OPEN SPACE AND ASSOCIATED
ENGINEERING OPERATIONS AT SITE AT HENS NEST ROAD, EAST
WHITBURN, EH47 8RX

October 2021

WIN-170-2006 - Sanquhar II Community Wind Farm – Hearing Session 2

Friday, 22nd October 2021 at 10:00am
Hearing Session on Conditions and Legal Agreement for proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.

WIN-170-2006 - Sanquhar II Community Wind Farm – Hearing Session 1

Thursday, 21st October 2021 at 10:00am
Hearing Session on Energy and Planning Policy for proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.

POA-290-2002 - Land At Cauldcoats, Dalkeith - Hearing Session

Wednesday, 13th October 2021 at 10:00am
Hearing Session for Proposed Application To Modify A Planning Obligation Within A Legal Agreement Associated With Planning Permission 14/00910/Ppp

September 2021

August 2021

WIN-170-2005 - Shepherds Rig Wind Farm – Hearing Session 3 – Conditions - INQUIRY CANCELLED - NEW DATE TBC

Friday, 27th August 2021 at 10:08am
Hearing Session on Conditions for proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Heght 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works.
Archiving - Available soon

WIN-170-2005 - Shepherds Rig Wind Farm – Hearing Sessions 1 & 2 - Planning and Energy Policy & Traffic and Transport - INQUIRY CANCELLED - NEW DATE TBC

Thursday, 26th August 2021 at 9:30am
Hearing Sessions on Planning and Energy Policy & Traffic and Transport for proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Heght 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works.
Archiving - Available soon

TRO-230-4 & ROD-230-4 Hearing

Thursday, 19th August 2021 at 10:00am
Hearing Session into Traffic Regulation Order 17/101 and Redetermination of Means of Exercise of Public Right of Passage Order 201, Buccleuch Street, Chapel Street, Nicolson Street And West Crosscauseway, Edinburgh, EH8 9NG

June 2021

WIN-370-3 – Clauchrie Wind Farm – Hearing Session - Conditions

Wednesday, 23rd June 2021 at 9:30am
Hearing Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment

WIN-370-3 – Clauchrie Wind Farm – Hearing Session 1 - Socio-economics & Tourism

Thursday, 3rd June 2021 at 10:00am
Hearing Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment

April 2021

March 2021

CPO-340-6 - HEARING CANCELLED

Tuesday, 30th March 2021 at 10:00am
Hearing for CPO-340-6.
Archiving - Available soon

PPA-230-2316

Wednesday, 17th March 2021 at 9:30am
Hearing Sessions for PPA-230-2316.

PPA-230-2316

Tuesday, 16th March 2021 at 10:00am
Hearing Sessions for PPA-230-2316.