Webcast library - DPEA Webcasts

Library listings 

December 2021

PPA-270-2238 - Hearing Session on the Impacts on Wild Land Area 39

Thursday, 16th December 2021 at 10:00am
WIND FARM COMPRISING ERECTION OF 7 TURBINES AND ASSOCIATED INFRASTRUCTURE KNOWN AS DRUM HOLLISTAN 2 AT LAND 2215 METRES SOUTH WEST OF UNDER KEEPERS COTTAGE, SANDSIDE, REAY, KW14 8AJ

November 2021

September 2021

WIN-110-1 - Fetteresso Wind Farm

Monday, 13th September 2021 at 10:00am
PEM - Construction Of A Wind Farm Comprising; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 200 Metres; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 180 Metres; And Six Turbines With A Maximum Height (Base To Tip) Not Exceeding 149.9 Metres

June 2021

WIN-370-3 – Clauchrie Wind Farm – Inquiry Session - Aviation – Radar Mitigation

Friday, 11th June 2021 at 9:30am
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment

WIN-370-3 – Clauchrie Wind Farm – Inquiry Session - Aviation – Radar Mitigation

Thursday, 10th June 2021 at 9:30am
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment

WIN-370-3 – Clauchrie Wind Farm – Inquiry Session - Aviation – Radar Mitigation

Wednesday, 9th June 2021 at 10:00am
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment

WIN-370-3 – Clauchrie Wind Farm – Inquiry Session - Aviation – Radar Mitigation

Tuesday, 8th June 2021 at 10:00am
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment

May 2021

WIN-110-1 - Fetteresso Wind Farm - PEM

Monday, 24th May 2021 at 10:00am
Construction Of Wind Farm Comprising 10 Turbines. 4 Turbines Of Overall Height Not Exceeding Height Of 200 M. 3 Turbines Not Exceeding Height Of 180 M. 3 Turbines Not Exceeding Height Of 149.9 M

September 2020

WIN-300-4/5

Wednesday, 16th September 2020 at 9:30am
Inquiry into proposed Clash Gour and Rothes III windfarms. Day 10

WIN-300-4/5

Tuesday, 15th September 2020 at 10:00am
Inquiry into proposed Clash Gour and Rothes III windfarms. Day 9

WIN-300-4/5

Wednesday, 9th September 2020 at 10:00am
Inquiry into proposed Clash Gour and Rothes III windfarms. Day 6

WIN-300-4/5

Tuesday, 8th September 2020 at 10:00am
Inquiry into proposed Clash Gour and Rothes III windfarms. Day 5

WIN-300-4 & 5

Friday, 4th September 2020 at 10:00am
Inquiry into proposed Clash Gour and Rothes III windfarms - Day 4

WIN-300-4 & 5

Thursday, 3rd September 2020 at 10:00am
Inquiry into proposed Clash Gour and Rothes III windfarms - Day 3

WIN-300-4 & 5

Wednesday, 2nd September 2020 at 10:00am
Inquiry into proposed Clash Gour and Rothes III windfarms - Day 2

WIN-300-4 & 5

Tuesday, 1st September 2020 at 10:00am
Inquiry into proposed Clash Gour and Rothes III windfarms - Day 1

March 2020

WIN-140-8

Wednesday, 11th March 2020 at 9:30am
Inquiry for the Proposed Crystal Rig IV Wind Farm

WIN-140-8

Tuesday, 10th March 2020 at 9:30am
Inquiry for the Proposed Crystal Rig IV Wind Farm

August 2019

PPA-140-2072

Tuesday, 6th August 2019 at 10:00am
Hearing for planning appeal regarding proposed wind farm land west of Whitslaid (Barrel Law)