We use cookies to remember your preferences, collect information about how you use the site, and connect to third-party services.
Read our Cookie policy
In person hearing at Halladale Hall for Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Wind Powered Electricity Generating Station Called Kirkton Energy Park, 2.1Km South Of Melvich, Sutherland, In The Highland Council Planning Authority Area
In person hearing at Halladale Hall for Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Wind Powered Electricity Generating Station Called Kirkton Energy Park, 2.1Km South Of Melvich, Sutherland, In The Highland Council Planning Authority Area
Community Hearing session for session for proposed Construction Of An 18 Hole Golf Course, Practice Area, Access, Parking, Ancillary Infrastructure And The Change Of Use Of Existing Buildings To Form Clubhouse, Pro Shop, Maintenance Shed And Ancillary Facilities
Hearing session for session for proposed Construction Of An 18 Hole Golf Course, Practice Area, Access, Parking, Ancillary Infrastructure And The Change Of Use Of Existing Buildings To Form Clubhouse, Pro Shop, Maintenance Shed And Ancillary Facilities
Hearing session for session for proposed Construction Of An 18 Hole Golf Course, Practice Area, Access, Parking, Ancillary Infrastructure And The Change Of Use Of Existing Buildings To Form Clubhouse, Pro Shop, Maintenance Shed And Ancillary Facilities
Hearing session for session for proposed Construction Of An 18 Hole Golf Course, Practice Area, Access, Parking, Ancillary Infrastructure And The Change Of Use Of Existing Buildings To Form Clubhouse, Pro Shop, Maintenance Shed And Ancillary Facilities
Hearing session for session for proposed Construction Of An 18 Hole Golf Course, Practice Area, Access, Parking, Ancillary Infrastructure And The Change Of Use Of Existing Buildings To Form Clubhouse, Pro Shop, Maintenance Shed And Ancillary Facilities
Hearing session for Planning permission Appeal for the Formation Of Golf Driving Range (Class 11) With Ancillary Uses Including, Food And Drink Cafe, Club House And Multipurpose Community Space, And Proposed Engineering Works, Formation Of Vehicular Access, Pedestrian Pathways,
Parking And Associated Works
Pre Examination Meeting for Proposed Onshore Wind Farm To Be Located In
The Scottish Borders Comprising Of 14 Turbines, Hub Height 110 Metres And Each Turbine Will Have A Maximum Height To Blade Tip Up To 180 Metres
Pre-Examination Meeting - for Compulsory Purchase Order of existing B714 and Roundabout connection To The A737 Dairy Bypass between Girthill Farm and Diddup Farm
Pre-Examination meeting for- an Application Under S36 Of The Electricity Act 1989 For The Scoop Hill Community Wind Farm Comprising Of 60 Turbines (23 Turbines At 250M To Tip, 2 Turbines At 225M To Tip, 29 Turbines At 200M To Tip, And 6 Turbines At 180M To Tip) With A Combined Generating Capacity Of 432Mw, And Associated Works
Pre Examination Meeting for an Application For Consent Under Section 36 Of The Electricity Act 1989 Construction And Operation Of Up To 13 Turbines Of Up To 200M To Tip And Associated Infrastructure
Inquiry for - a Compulsory Purchase order relating to THE RENFREWSHIRE COUNCIL (ADVANCED MANUFACTURING INNOVATION
DISTRICT SCOTLAND, SOUTH) COMPULSORY PURCHASE ORDER 2023 G51
PEM for Proposed Onshore Wind Farm To Be Located In
The Scottish Borders Comprising Of 14 Turbines, Hub Height 110 Metres And Each Turbine Will Have A Maximum Height To Blade Tip Up To 180 Metres.
Pre Examination Meeting for an Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Wind Powered Electricity Generating Station Called Kirkton Energy Park, 2.1Km South Of Melvich, Sutherland, In The Highland Council Planning Authority Area
Aviation Inquiry for A Proposed Renewable Energy Development, Comprising 13 Onshore Wind Turbines With A Generating Capacity Of Around 78Mw, Solar Photovoltaic Array Around 5Mw And Battery Storage Technologies Around 25Mw.
Aviation Safety Inquiry for A Proposed Renewable Energy Development, Comprising 13 Onshore Wind Turbines With A Generating Capacity Of Around 78Mw, Solar Photovoltaic Array Around 5Mw And Battery Storage Technologies Around 25Mw.
Hearing for the Application For Certificate Of Appropriate Alternative Development - Request For A View On The Suitability Of The Site For Affordable Housing Development.
Pre-Examination Meeting session for proposed Compulsory Purchase Order 2023 for the The Transportation Of Windfarm Components From Scrabster Harbour To Wind Farm Site
Pre Examination Meeting for -Necessary Wayleave Application For Application For A Section Of Underground Cable At Land At The Former Kincardine Power Station Site, Kincardine, Alloa
Pre Examination Meeting for - a Compulsory Purchase order relating toTHE RENFREWSHIRE COUNCIL (ADVANCED MANUFACTURING INNOVATION
DISTRICT SCOTLAND, SOUTH) COMPULSORY PURCHASE ORDER 2023 G51
Pre-Examination Meeting session for proposed Construction Of An 18 Hole Golf Course, Practice Area, Access, Parking, Ancillary Infrastructure And The Change Of Use Of Existing Buildings To Form Clubhouse, Pro Shop, Maintenance Shed And Ancillary Facilities
Pre-Examination Meeting session for proposed Compulsory Purchase Order 2023 -The City Of Edinburgh Council (West Edinburgh Link: Southern And Central Sections) Compulsory Purchase Order 2023
Hearing sessions for proposed Compulsory Purchase Order 2023 - Acquire The Necessary Rights And Land To Construct, Operate And Remove Electricity Transmission Lines,At Skateraw And The National Electricity Transmission System (Or "Grid") Connection Point At Branxton
Aviation safety Inquiry Session for the proposed Earraghail Renewable Energy Development - Located On The Kintyre Peninsula- Between The Village Of Tarbert To The Northeast, And The Village Of Skipness To The South
Policy & Conditions Hearing for Garvary Wind Farm- An Application For A Windfarm Under Section 36 Of The Electricity Act 1989 Comprising Of 25 Wind Turbines, Access Tracks, Up To 4 Borrow Pits, Substation, Battery Storage Compound, Control Building, 2 Meteorological Masts, And Ancillary Infrastructure.
Inquiry session for Garvary Wind Farm- An Application For A Windfarm Under Section 36 Of The Electricity Act 1989 Comprising Of 25 Wind Turbines, Access Tracks, Up To 4 Borrow Pits, Substation, Battery Storage Compound, Control Building, 2 Meteorological Masts, And Ancillary Infrastructure.
Inquiry session for Garvary Wind Farm- An Application For A Windfarm Under Section 36 Of The Electricity Act 1989 Comprising Of 25 Wind Turbines, Access Tracks, Up To 4 Borrow Pits, Substation, Battery Storage Compound, Control Building, 2 Meteorological Masts, And Ancillary Infrastructure.
Hearing for Erection Of Wind Farm Comprising Nine Turbines, Formation Of Access Tracks, Borrow Pits, Battery Storage, Temporary Construction Compound, Substation And Associated Infrastructure
Energy and Planning Policy and conditions hearings for A Proposed Renewable Energy Development, Comprising 13 Onshore Wind Turbines With A Generating Capacity Of Around 78Mw, Solar Photovoltaic Array Around 5Mw And Battery Storage Technologies Around 25Mw.
Unfortunately it has not been possible to live stream this session due to broadband issues. The session is being recorded and will be uploaded as soon as possible
Unfortunately it has not been possible to live stream this session due to broadband issues. The session is being recorded and will be uploaded as soon as possible
Inquiry Session for the proposed Earraghail Renewable Energy Development - Located On The Kintyre Peninsula- Between The Village Of Tarbert To The Northeast, And The Village Of Skipness To The South
Hearing for proposed Planning Permission In Principle For Residential Development (Section 42 Application For The Development The Subject Of Planning Permission In Principle 22/00984/Ppp Without Complying With Its Conditions 1(D) And 3)
PEM for an Application for an Erection Of Wind Farm Comprising Nine Turbines, Formation Of Access Tracks, Borrow Pits, Battery Storage, Temporary Construction Compound, Substation And Associated Infrastructure
Pre Examination Meeting for Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Installation Of A Wind Farm Comprising Up To 14 Wind Turbines Of Up To 200M To Tip Height And Associated Infrastructure And Battery Storage Of 7 Mw - Craiginmoddie Wind Farm
Hearing Session on Conditions for an Application For Consent Under Section 36 Of The Electricity Act 1989 For The Clachaig Glen Wind Farm, Comprising 12 Turbines (Five With A Tip Height (Th) Of 200M, Seven With A Th Of 185M), Ancillary Infrastructure And Battery Storage Units.
Inquiry Session on Landscape & Visual Impact Assessment maters on an Application For Consent Under Section 36 Of The Electricity Act 1989 For The Clachaig Glen Wind Farm, Comprising 12 Turbines (Five With A Tip Height (Th) Of 200M, Seven With A Th Of 185M), Ancillary Infrastructure And Battery Storage Units.
Inquiry Session on Landscape & Visual Impact Assessment maters on an Application For Consent Under Section 36 Of The Electricity Act 1989 For The Clachaig Glen Wind Farm, Comprising 12 Turbines (Five With A Tip Height (Th) Of 200M, Seven With A Th Of 185M), Ancillary Infrastructure And Battery Storage Units.
Hearing Session on Noise maters on an Application For Consent Under Section 36 Of The Electricity Act 1989 For The Clachaig Glen Wind Farm, Comprising 12 Turbines (Five With A Tip Height (Th) Of 200M, Seven With A Th Of 185M), Ancillary Infrastructure And Battery Storage Units.
Hearing Session on Policy maters on an Application For Consent Under Section 36 Of The Electricity Act 1989 For The Clachaig Glen Wind Farm, Comprising 12 Turbines (Five With A Tip Height (Th) Of 200M, Seven With A Th Of 185M), Ancillary Infrastructure And Battery Storage Units.
PEM for The Berwick Bank Wind Farm (Onshore Works) Compulsory Purchase Order 2023 - Acquire The Necessary Rights And Land To Construct, Operate And Remove Electricity Transmission Lines, Plant And Ancillary Infrastructure Between Mean Low Water Springs At Skateraw And The National Electricity Transmission System (Or "Grid") Connection Point At Branxton
PEM for An Application For A Windfarm Under Section 36 Of The Electricity Act 1989 Comprising Of 25 Wind Turbines, Access Tracks, Up To 4 Borrow Pits, Substation, Battery Storage Compound, Control Building, 2 Meteorological Masts, And Ancillary Infrastructure.
Pre-examination meeting for the Necessary Wayleave Application For The Installation Of New Electric Line On And Over Land At Balmeanach And Glen Vicaskill Forest In Relation To Skye 132 Kv Reinforcement Project (Ecdu Ref - Ecu00004752)
Hearing session for Application For The Development Of The Consisting Of 10 Wind Turbines Up To 149.9 M In Height To Blade Tip With An Installed Generating Capacity Of Around 50 Megawatts (Mw), And Around 15 Mw Of Ground Mounted Solar Arrays Producing A Combined Output Of Around 65 Mw
Hearing sessions for Application For The Development Of The Consisting Of 10 Wind Turbines Up To 149.9 M In Height To Blade Tip With An Installed Generating Capacity Of Around 50 Megawatts (Mw), And Around 15 Mw Of Ground Mounted Solar Arrays Producing A Combined Output Of Around 65 Mw
Pre-Examination meeting for A Proposed Renewable Energy Development, Comprising 13 Onshore Wind Turbines With A Generating Capacity Of Around 78Mw, Solar Photovoltaic Array Around 5Mw And Battery Storage Technologies Around 25Mw.
Inquiry session on Effects on wild salmon from the risk of escape of farmed fish for the Installation Of A Marine Fish Farm And Associated Development Including Shore Base, Slipway And Pontoon And Road Upgrades
Effects on wild salmon from the risk of escape of farmed fish inquiry for the Installation Of A Marine Fish Farm And Associated Development Including Shore Base, Slipway And Pontoon And Road Upgrades
Effects on wild salmon from the risk of escape or farmed fish inquiry for the Installation Of A Marine Fish Farm And Associated Development Including Shore Base, Slipway And Pontoon And Road Upgrades
Landscape, seascape and visual impacts hearing for the Installation Of A Marine Fish Farm And Associated Development Including Shore Base, Slipway And Pontoon And Road Upgrades
The Nature of Development Hearing for the Installation Of A Marine Fish Farm And Associated Development Including Shore Base, Slipway And Pontoon And Road Upgrades
Planning and other relevant policy hearing for the Installation Of A Marine Fish Farm And Associated Development Including Shore Base, Slipway And Pontoon And Road Upgrades
Hearing Session on preliminary issues, substantive issues and air quality improvements for proposed Modification Of Planning Obligation Relating To Planning Permission 0801/Ful/20 To Remove Clause 1.1 And Alter Wording Of Clauses 2.3 And 2.4 To Remove The Requirement For Traffic Improvements Contribution
Hearing Session on preliminary issues, substantive issues and air quality improvements for proposed Modification Of Planning Obligation Relating To Planning Permission 0801/Ful/20 To Remove Clause 1.1 And Alter Wording Of Clauses 2.3 And 2.4 To Remove The Requirement For Traffic Improvements Contribution
Hearing session on proposed conditions and terms of the legal agreement for proposed residential development with potential for Classes 1A (Shops and
financial, professional and other services), Class 3 (Food and Drink), Class 4 (Business), landscaping/public realm and associated works.
Pre-examination meeting to arrange inquiry procedure for proposed Mixed-Use Development Including Built-To-Rent Homes And Student Accommodation (Comprising 393 Built-To-Rent Apartments And Student Accommodation) Totalling 406 Bed Spaces With Ancillary Development Including Commercial Use (Class 1, 2, 3, 4, 10, And 11), Demolitions, Public Realm, Landscaping And Access.
Pre-Examination meeting for Sp Transmission Plc (Chestnut Avenue) Compulsory Purchase Order 2021 To Acquire Rights Over Land For The Purposes Of Implementing The Erskine Devol Moor Project.
Pre-Examination meeting to discuss inquiry procedure for proposed Application For Consent Under Section 36 Of The Electricity Act 1989 For The Clachaig Glen Wind Farm, Comprising 12 Turbines (Five With A Tip Height (Th) Of 200M, Seven With A Th Of 185M),Ancillary Infrastructure And Battery Storage Units
Pre-Examination Meeting for The Berwick Bank Wind Farm (Onshore Works) Compulsory Purchase Order 2023 - Acquire The Necessary Rights And Land To Construct, Operate And Remove Electricity Transmission Lines, Plant And Ancillary Infrastructure Between Mean Low Water Springs At Skateraw And The National Electricity Transmission System (Or "Grid") Connection Point At Branxton
Pre-Examination Meeting to arrange inquiry procedure for notified application of Mixed Use, Seven Storey Development Consisting Of 109 Apartments And Commercial Units, Site Bounded By Candleriggs/ Ingram Street/ Albion Street, Glasgow
Community hearing session for proposed 13.3 Kilometre (Km) Double Circuit 275 Kv Ohl, Supported By 48 Lattice Steel Towers Between A Proposed Substation At Creag Dhubh To The Existing Spen 275 Kv Ohl, Known As The Yw Route, That Runs From Dalmally To Inverarnan, Near Succoth Glen (Glen Lochy)
Hearing session on alternative routes for proposed 13.3 Kilometre (Km) Double Circuit 275 Kv Ohl, Supported By 48 Lattice Steel Towers Between A Proposed Substation At Creag Dhubh To The Existing Spen 275 Kv Ohl, Known As The Yw Route, That Runs From Dalmally To Inverarnan, Near Succoth Glen (Glen Lochy)
Hearing session on policy for proposed 13.3 Kilometre (Km) Double Circuit 275 Kv Ohl, Supported By 48 Lattice Steel Towers Between A Proposed Substation At Creag Dhubh To The Existing Spen 275 Kv Ohl, Known As The Yw Route, That Runs From Dalmally To Inverarnan, Near Succoth Glen (Glen Lochy)
Hearing session on landscape and visual effects for proposed 13.3 Kilometre (Km) Double Circuit 275 Kv Ohl, Supported By 48 Lattice Steel Towers Between A Proposed Substation At Creag Dhubh To The Existing Spen 275 Kv Ohl, Known As The Yw Route, That Runs From Dalmally To Inverarnan, Near Succoth Glen (Glen Lochy)
Meeting to discuss arrangements for the examination of the application for a development consisting of 10 Wind Turbines Up To 149.9 M In Height To Blade Tip With An Installed Generating Capacity Of Around 50 Megawatts (Mw), And Around 15 Mw Of Ground Mounted Solar Arrays Producing A Combined Output Of Around 65 Mw
Landscape and visual impacts, aviation lighting inquiry for Application Under Section 36 Of Electricity Act 1989 (As Amended) For Construction And Operation Of Knockcronal Windfarm Comprising 9 Wind Turbines (With Combined Generating Capacity Of 59.4 Mw), Proposed Energy Storage Facility And Associated Infrastructure.
Landscape and visual impacts, aviation lighting inquiry for Application Under Section 36 Of Electricity Act 1989 (As Amended) For Construction And Operation Of Knockcronal Windfarm Comprising 9 Wind Turbines (With Combined Generating Capacity Of 59.4 Mw), Proposed Energy Storage Facility And Associated Infrastructure.
Landscape and visual impacts, aviation lighting inquiry for Application Under Section 36 Of Electricity Act 1989 (As Amended) For Construction And Operation Of Knockcronal Windfarm Comprising 9 Wind Turbines (With Combined Generating Capacity Of 59.4 Mw), Proposed Energy Storage Facility And Associated Infrastructure.
Pre-Examination Meeting to arrange inquiry procedure for proposed Installation Of A Marine Fish Farm And Associated Development Including Shore Base, Slipway And Pontoon And Road Upgrades
Hearing session on Hydrology, hydrogeology and geology - Private water supplies for proposed Applications For Consent Under S36 Of The Electricity Act 1989
Evening hearing session on Landscape and Visual Effects and Residential Visual Amenity for proposed Applications For Consent Under S36 Of The Electricity Act 1989
Meeting to make arrangements for the examination of the proposal to install and operate a Wind Farm comprising of up To 11 wind turbines, with a generation capacity up to approximately 72.6 Mw, 5Mw battery storage and associated infrastructure at Strath Oykel Forest
NPF4/Policy Hearing for Consent Under S37 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 To Install And Keep Installed Overhead Electric Lines Described Collectively As The Kendoon To Tongland Reinforcement Project In Dumfries And Galloway Planning Authority Area
Hearing Session for proposed Mixed Use Development Including Business And Employment Uses (Class 4); Hotels (Class 7) And Ancillary Uses Including Retail (Class 1), Financial And Professional Services (Class 2), Food And Drink (Class 3), Residential (Class 9), Non-Residential Institutions (Class 10), Assembly And Leisure (Class 11), Sui Generis Flatted Development; Associated Works Including Car Parking, Servicing, Access And Public Realm (As Amended)
Hearing Session for proposed Mixed Use Development Including Business And Employment Uses (Class 4); Hotels (Class 7) And Ancillary Uses Including Retail (Class 1), Financial And Professional Services (Class 2), Food And Drink (Class 3), Residential (Class 9), Non-Residential Institutions (Class 10), Assembly And Leisure (Class 11), Sui Generis Flatted Development; Associated Works Including Car Parking, Servicing, Access And Public Realm (As Amended)
Hearing session for proposed Asset Transfer Request For 8.28 Hectare Field - Smiddy Field. Phase 1 Will Involve The Development Of The Main Allotment Site Open For Both Individuals And Groups, A Community Orchard And Areas For Walking And Outdoor Recreation. Phase 2 Will Involve Extending The Allotments, Outdoor Space Available And Number Of Polytunnels. Phase 3 Will Involve Increasing The Site’S Capacity For Food Production By Converting The Eastern End Of The Site Into Growing Areas For A Community Supported Agricult
Inquiry Session on Eskdalemuir Seismic Array for Proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Inquiry Session on Eskdalemuir Seismic Array for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Inquiry Session on Eskdalemuir Seismic Array for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Inquiry Session on Eskdalemuir Seismic Array for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Pre-Examination meeting to arrange inquiry procedure for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Wind Powered Electricity Generating Station Called Corriegarth 2 Wind Farm In The Highland
Council Planning Authority Area
Pre-Examination Meeting to arrange inquiry procedure for proposed 13.3 Kilometre (Km) Double Circuit 275 Kv Ohl, Supported By 48 Lattice Steel Towers Between A Proposed Substation At Creag Dhubh To The Existing Spen 275 Kv Ohl, Known As The Yw Route, That Runs From Dalmally To Inverarnan, Near Succoth Glen (Glen Lochy);
Hearing Session on NPF4 relating to Application For The Proposed Glendye Wind Farm With An Anticipated Installed Capacity Of 104 Mw; 26 Wind Turbines, Each Up To A Maximum Blade Tip Height Of 149.9M, Substation, Access Tracks And Associated Works
Hearing session on NP4 for proposed Application For Consent Under Section 36 Of The Electricity Act 1989 For The Construction And Operation Of A Wind Farm Comprising 17 Turbines With A Hub Height Of Up To 104 Metres And A Maximum Height To Blade Tip Of Not More Than 175 Metres, With An Anticipated Installed Capacity Of 81.6 Mw, And Associated Infrastructure
Hearing Session on NPF4 for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Cairn Duhie Wind Farm Located Within The Highland Council Planning Authority Area - Application Is For Consent For A Wind Farm With An Installed Capacity Of More Than 50Mw And Envisages A Development Of Up To 16 Wind Turbines At Up To 149.9 M To Blade Tip And Associated Infrastructure For A Period Of 35 Years
Hearing Session on NPF4 for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Pre-Examination Meeting to arrange inquiry procedure for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Wind Powered Electricity Generating Station Called Corriegarth 2 Wind Farm In The Highland Council Planning Authority Area
Hearing Session on NPF4 for proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M, With An Installed Capacity Of 350 Mw
PEM to arrange inquiry procedure for proposed Necessary Wayleave Application To Install And Keep Installed A Section Of 132Kv Overhead Electric Line, Together With Other Associated Apparatus On Lands At Knocknalling Estate and Stroangassel
Hearing Session for proposed Mixed Use Development To Include Up To 4,700 Sqm Of Class 1, 2 And 3 Uses; Public House/Restaurant Incorporating Manager's Residential Accommodation; Community Allotments; All With Associated Engineering Works, Car Parking, Servicing, New Access Roads & Landscaping (Renewal Of Planning Permission In Principle 13/04334/Pip)
Inquiry Session on Landscape and Visual Impact for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Cairn Duhie Wind Farm Located Within The Highland Council Planning Authority Area - Application Is For Consent For A Wind Farm With An Installed Capacity Of More Than 50Mw And Envisages A Development Of Up To 16 Wind Turbines At Up To 149.9 M To Blade Tip And Associated Infrastructure For A Period Of 35 Years
Pre-Examination Meeting to arrange inquiry procedure for proposed PA29 Erection Of 11 Turbines of Up To 180M To Blade Tip and Associated Infrastructure
Inquiry Session on Landscape and Visual for proposed Application To Erect And Operate The Kintradwell Wind Farm, With An Installed Capacity Of More Than 50 Mw, Which Includes Up To 15 Turbines Up To 149.9M To Blade Tip, And Associated Infrastructure, Including Battery Storage Infrastructure
Inquiry Session on Landscape and Visual for proposed Application To Erect And Operate The Kintradwell Wind Farm, With An Installed Capacity Of More Than 50 Mw, Which Includes Up To 15 Turbines Up To 149.9M To Blade Tip, And Associated Infrastructure, Including Battery Storage Infrastructure
Policy and Conditions Hearing Sessions for Proposed Application To Erect And Operate The Kintradwell Wind Farm, With An Installed Capacity Of More Than 50 Mw, Which Includes Up To 15 Turbines Up To 149.9M To Blade Tip, And Associated Infrastructure, Including Battery Storage Infrastructure
2nd Pre Examination Meeting to arrange inquiry procedure for proposed Application To Erect And Operate The Kintradwell Wind Farm, With An Installed Capacity Of More Than 50 Mw, Which Includes Up To 15 Turbines Up To 149.9M To Blade Tip, And Associated Infrastructure, Including Battery Storage Infrastructure
Pre Examination Meeting to arrange inquiry procedure for proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Cairn Duhie Wind Farm Located Within The Highland Council Planning Authority Area - Application Is For Consent For A Wind Farm With An Installed Capacity Of More Than 50Mw And Envisages A Development Of Up To 16 Wind Turbines At Up To 149.9 M To Blade Tip And Associated Infrastructure For A Period Of 35 Years
Day 3 of inquiry for proposed Glendye Windfarm - Assessment of landscape, visual and cumulative impacts. Hearing Sessions will follow the conclusion of the inquiry.
Inquiry Session on Landscape and Visual Impacts for Proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Inquiry Session on Cultural Heritage for Proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Inquiry Session on Cultural Heritage for Proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Inquiry Session on Landscape and Visual Impacts for Proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Inquiry Session on Landscape and Visual Impacts for Proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Hearing Session on Planning and Energy Policy for Proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines, With An Installed Capacity Of 315 Mw, And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Pre Examination Meeting to arrange inquiry procedure for proposed Application To Erect And Operate The Kintradwell Wind Farm, With An Installed Capacity Of More Than 50 Mw, Which Includes Up To 15 Turbines Up To 149.9M To Blade Tip, And Associated Infrastructure, Including Battery Storage Infrastructure
Pre Examination Meeting for Consent Under S37 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 To Install And Keep Installed Overhead Electric Lines Described Collectively As The Kendoon To Tongland Reinforcement Project In Dumfries And Galloway Planning Authority Area
Inquiry Session into proposed Erection Of 10 Wind Turbines With A Maximum Blade Tip Height Of 149.9M, With Approximate Generating Capacity Of 42 Mw, With Associated Access And Infrastructure
Inquiry Session into proposed Erection Of 10 Wind Turbines With A Maximum Blade Tip Height Of 149.9M, With Approximate Generating Capacity Of 42 Mw, With Associated Access And Infrastructure
Pre Examination Meeting to arrange inquiry procedure for proposed Stopping Up of A Section Of Scapa Crescent, Kirkwall To Facilitate The Redevelopment Of Garden House, New Scapa Road, Kirkwall
Hearing Session on landscape and visual impact issues and conditions for proposed Erection Of 7 Wind Turbines (Up To 149.9M From Base To Tip) With Associated Development Including Formation Of Access Trakcs, Formation Of Upgraded Access, Borrow Pits And Temporary Construction Compound, Erection Of Permanent Anemometry Mast, Substation Building And Associated Infrastructure
Hearing Session on policy issues for proposed Erection Of 7 Wind Turbines (Up To 149.9M From Base To Tip) With Associated Development Including Formation Of Access Trakcs, Formation Of Upgraded Access, Borrow Pits And Temporary Construction Compound, Erection Of Permanent Anemometry Mast, Substation Building And Associated Infrastructure
Hearing session into proposed Application Made Under Electricity Act 1989 Schedule 4 For The Retention Of Exisiting Electricity Lines On Land At Newlands Farm, Denholm, Hawick
Hearing for Perth And Kinross Council (Core Path Lunc/121 And Right Of Way) Stopping Up And Diversion (No 3) Order 2021, Perth And Kinross Council (Core Path Lunc/102) Stopping Up And Diversion (No 2) Order 2021 and Perth And Kinross Council (Core Path Lunc/2 And Right Of Way 36/2) Stopping Up And Diversion (No 1) Order 2021
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Electricity Act 1989 Section 36: Application For The Proposed Glendye Wind Farm; 26 Wind Turbines, Each Up To A Maximum Blade Tip Height Of 149.9M, Substation, Access Tracks And Associated Works
Inquiry Session into proposed Application For Consent Under Section 36 Of The Electricity Act 1989 For The Construction And Operation Of A Wind Farm Comprising 17 Turbines With A Hub Height Of Up To 104 Metres And A Maximum Height To Blade Tip Of Not More Than 175 Metres And Associated Infrastructure
Inquiry Session into proposed Application For Consent Under Section 36 Of The Electricity Act 1989 For The Construction And Operation Of A Wind Farm Comprising 17 Turbines With A Hub Height Of Up To 104 Metres And A Maximum Height To Blade Tip Of Not More Than 175 Metres And Associated Infrastructure
Inquiry Session 2 - Ecology (Wildcat) - Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Clashindarroch II Wind Farm
Hearing - The Highland Council (Land Between The Heights And El Palomino, Ladystone, Bunchrew, Inverness)(Revocation) Order 2021 - Erection Of A House, Installation Of Septic Tank And Soakaway (Renewal Of Previous Permission 13/0071/S42)
Inquiry Session 1 - Landscape and Visual - Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Clashindarroch II Wind Farm
Inquiry Session 1 - Landscape and Visual - Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Clashindarroch II Wind Farm
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For The Construction And Operation Of 45 No Wind Turbines And Associated Access Tracks, Infrastructure Including Substation/Control Room Buildings And Compound, Temporary Construction Compound, Meteorological Mast And Temporary Borrow Pits At Faw Side Wind Farm
Erection Of 10 Wind Turbines With A Maximum Blade Tip Height Of 149.9M With Associated Access And Infrastructure at Rigghill Wind Farm, Site To East Of Fardens, Skelmorlie, PA17 5AQ
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Application Made Under Electricity Act 1989 Schedule 4 For The Retention Of Exisiting Electricity Lines On Land At Newlands Farn, Denholm, Hawick
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed 11 Wind Turbines Up To 149.9M Blade Tip Height And Associated Infrastructure (Slickly Wind Farm)
WIND FARM COMPRISING ERECTION OF 7 TURBINES AND ASSOCIATED INFRASTRUCTURE KNOWN AS DRUM HOLLISTAN 2 AT LAND 2215 METRES SOUTH WEST OF UNDER KEEPERS COTTAGE, SANDSIDE, REAY, KW14 8AJ
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Clashindarroch Ii Wind Farm
2nd Pre Inquiry Meeting into Application For Consent Under Section 36 Of The Electricity Act 1989 For The Construction And Operation Of A Wind Farm Comprising 17 Turbines With A Hub Height Of Up To 104 Metres And A Maximum Height To Blade Tip Of Not More Than 175 Metres And Associated Infrastructure
Hearing Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw
Hearing Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw
Inquiry Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw
Inquiry Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw
Inquiry Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw
Inquiry Session into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw
Hearing Sessions on Policy Matters, Design Matters and Planning Obligations and Conditions for Proposed Erection Of Mixed-Use Development Comprising Residential Flats (182 Units) (Sui Generis), One Commercial Unit (Classes 1, 2 Or 3), One Rehearsal Space (Class 10) With Associated Landscaping And Infrastructure
Hearing Session on The terms of the draft conditions and any areas of disagreement between the parties on these for proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
Hearing Session into the proposed Development Of 53.7 Hectares Of Existing Agricultural Land For Residential Development With Associated Infrastructure, Landscaping And Boundary Treatments
Hearing Sessions on Planning and energy policy and Traffic and transport for proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
Hearing Session into the proposed Development Of 53.7 Hectares Of Existing Agricultural Land For Residential Development With Associated Infrastructure, Landscaping And Boundary Treatments
Inquiry Session into proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
Inquiry Session into proposed Erection Of 17 Wind Turbines (15 Turbines Maximum Hight 149.9 Metres And 2 Turbines Maximum Height 125 Metres), An Anemometer Mast (Height 100 Metres), Battery Storage Facility, Sub Station And Control Buildings, Formation Of Temporary Construction Compound, Two Borrow Pits, New Access, Access Tracks And Associated Works
HEARING FOR THE ERECTION OF 104 HOUSES,
FORMATION OF ACCESS ROADS, OPEN SPACE AND ASSOCIATED
ENGINEERING OPERATIONS AT SITE AT HENS NEST ROAD, EAST
WHITBURN, EH47 8RX
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Development Of A Public Park, Residential Development (Including Housing) Of 600 Units, Commercial Space (Neighbourhood Centre), Improvements To Road And Drainage Infrastructure And New Primary School.
Hearing Session on Conditions and Legal Agreement for proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Hearing Session on Energy and Planning Policy for proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Application For Consent Under Section 36 Of The Electricity Act 1989 For The Construction And Operation Of A Wind Farm Comprising 17 Turbines With A Hub Height Of Up To 104 Metres And A Maximum Height To Blade Tip Of Not More Than 175 Metres And Associated Infrastructure
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Inquiry Session into proposed Section 36 Application For The Design, Installation, Operation And Decommission Of A Wind Farm Comprising Of 42 Wind Turbines With A Maximum Blade Tip Height Of 200M And 2 Wind Turbines Having A Maximum Blade Tip Height Of 149M.
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Compulsory Purchase Orders, The Falkirk Council (Denny Eastern Access Road)
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Application For Consent Under S36 Of The Electricity Act 1989 And Deemed Planning Permission Under S57(2) Of The Town And Country Planning (Scotland) Act 1997 For Clashindarroch Ii Wind Farm
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Compulsory Purchase Order, The Scottish Water (Forres Waste Water Treatment Works Expansion)
PEM - Construction Of A Wind Farm Comprising; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 200 Metres; Two Turbines With A Maximum Height (Base To Tip) Not Exceeding 180 Metres; And Six Turbines With A Maximum Height (Base To Tip) Not Exceeding 149.9 Metres
Erection Of Mixed-Use Development Comprising Residential Flats (182 Units) (Sui Generis), One Commercial Unit (Classes 1, 2 Or 3), One Rehearsal Space (Class 10) With Associated Landscaping And Infrastructure at Site Between Sawmillfield Street/Farnell Street, Glasgow, G4 9SE
Hearing into the Application To Vary An Existing Permit (Ppc/E/0020054) For A "Part A" Activity Under The Pollution Prevention And Controls (Scotland) Regulations 2012 As Amended To Vary Appellant's Permit To Burn Pb Wesp Crumb As A Fuel In Onsite Biomass Combustion Plant
Hearing Session into Traffic Regulation Order 17/101 and Redetermination of Means of Exercise of Public Right of Passage Order 201, Buccleuch Street, Chapel Street, Nicolson Street And West Crosscauseway, Edinburgh, EH8 9NG
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Development Of Land For Houses, School And Associated Pitches, Open Space, Play Provision, Landscaping, Roads, Paths And Other Infrastructure
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Application To Modify A Planning Obligation Within A Legal Agreement Associated With Planning Permission
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Wind Farm Comprising Erection Of 7 Turbines And Associated Infrastructure.
Inquiry Session on Radar Mitigation for proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session on Radar Mitigation for proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Hearing Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Application Under Section 36 Of The Electricity Act 1989 For The Installation Of A Renewable Energy Development Comprising 19 Wind Turbines (16 At 149.9 M To Blade Tip And 3 At 135 M To Blade Tip) And Two Ground Mounted Solar Development Areas With Associated Site Infrastructure Such As Substation And Access Tracks. It Would Produce Around 134 Mw And Between 360 - 380 Gwh Of Electricity Annually. A Battery Storage Facility Would Also Be Installed With Storage Capacity Of Around 38 Mw.
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Compulsory Purchase Order, The Falkirk Council (Denny Eastern Access Road)
Hearing sessions into proposed Construction And Operation Of An Extension To Limekiln Wind Farm Comprising Of Up To 5 Wind Turbines And Associated Infrastructure
Inquiry Session into proposed Construction And Operation Of An Extension To Limekiln Wind Farm Comprising Of Up To 5 Wind Turbines And Associated Infrastructure
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Hearing Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Construction Of Wind Farm Comprising 10 Turbines. 4 Turbines Of Overall Height Not Exceeding Height Of 200 M. 3 Turbines Not Exceeding Height Of 180 M. 3 Turbines Not Exceeding Height Of 149.9 M
Inquiry Session into proposed Installation And Operation of A Windfarm Comprising of 18 Turbines With An Overall Generating Capacity In The Region Of 100 Mw. To Also Include Associated Infrastructure (Construction Compounds, Access Tracks, Substation Etc.) And Up To 25 Mw Of Energy Storage Equipment
Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Wind Farm Comprising Erection Of 7 Turbines And Associated Infrastructure.
Compulsory Purchase Order Has Been Made By Scottish Borders Council In Order To Acquire A Town Centre Building Described In The Order Schedule At 2 High Street/12 Market Place, Jedburgh
2nd Pre-Examination Meeting to arrange procedure for inquiry sessions into proposed Construction And Operation Of An Extension To Limekiln Wind Farm Comprising Of Up To 5 Wind Turbines And Associated Infrastructure.
Virtual Meeting regarding Modification Of Section 75 Agreement With Regard To The Provision Of Education Infrastructure For Land At Lasswade Road West Edge Farm, Edinburgh
Virtual Meeting regarding Modification Of Section 75 Agreement With Regard To The Provision Of Education Infrastructure For Land At Lasswade Road West Edge Farm, Edinburgh
**Not available live, will be available this evening ** Day 2 of Inquiry into proposed A9 Trunk Road (Killiecrankie to Glen Garry) Compulsory Purchase Order
**Please note this will not be live, the webcast will be available this evening ** Pre-examination meeting for inquiry to consider objections to proposed A9 Trunk Road (Killiecrankie to Glen Garry)
Pre-Examination meeting for Section 36 application by North Lowther Energy Initiative Limited at Queensberry Estate 5km south of Crawfordjohn, 2km north-east of Sanquhar and west of Wanlockhead, ML12 6SR
Pre-examination meeting regarding appeal against the refusal of planning permission by South Lanarkshire Council for the erection of waste processing facility
**PLEASE NOTE FIRST PART OF MEETING IS UNAVAILABLE DUE TO VIDEO FILE CORRUPTING, WE APOLOGISE FOR THIS INCONVENIENCE ** Pre-Examination meeting for called in application for planning permission for the development of 18 hole golf course and associated buildings
Pre-Examination meeting for North Lanarkshire Council (Elliot House, Morrison House and Stuart House, Burns Road, Cumbernauld) Compulsory Purchase Order 2017
Pre-Examination meeting regarding the proposed change of use, alterations to and restoration of principal former Royal High School buildings, Edinburgh
SAQP awards are one of the Scottish Government's most prestigious events to acknowledge achievements in planning - ranging from strategic visions to new settlements. Its aim is to recognise the hard work being carried out by, and within, the planning profession.